Shuttle expressway favours steel flexibility
Adelaide’s new 22km Southern Expressway will operate one-way only and will carry north-bound morning traffic towards Adelaide and south-bound evening traffic out of Adelaide in an efficient and free-flowing manner.
Construction will be carried out over a number of stages. Stage One is complete and stretches 6km between Bedford Park and Reynella and will eventually become the eastern side of a dual carriageway. Its design had to consider both initial requirements for reversible traffic flow and the final requirements for future two-way traffic flow. The two sets of conditions led to some unusual bridging criteria requiring specific design solutions that would suit both expressway configurations.
Related Case Studies
Subscribe to the
InfraBuild newsletter
Receive regular updates on news, case studies as well as the latest products and services.