271 Spring St
Key Information
- Steel was an essential enabler for 271 Spring St's cantilevered design
- InfraBuild Steel Centre supplied universal beams, columns, and channels sourced from InfraBuild's integrated supply chain.
- InfraBuild supplied over 2000 tonnes of steel to our longterm customers, GFC Industries
The site on 271 Spring St. will be a medium-sized commercial tower of 16 stories. The site has a significant historic overlay due to heritage buildings. Accordingly, a cantilevering design to maximise commercial floor space on the remainder of the site was required, with structural steel the superior construction option.
With an anchor tenant signed, GFC Industries and InfraBuild Steel Centre have secured the fabrication and steel supply contracts with the supply of steel commencing October 2017.